“FINANCIAL RISK ANALYSIS OF GREEN-FIELD GEOTHERMAL PROJECTS IN INDONESIA: THE IMPACT OF INTEREST RATE SUBSIDY” (2026) Lingkar: Journal of Environmental Engineering, 6(2), pp. 45–56. doi:10.22373/ljee.v6i2.10719.