[1]
Nur, S. 2026. FINANCIAL RISK ANALYSIS OF GREEN-FIELD GEOTHERMAL PROJECTS IN INDONESIA: THE IMPACT OF INTEREST RATE SUBSIDY. Lingkar: Journal of Environmental Engineering. 6, 2 (Aug. 2026), 45–56. DOI:https://doi.org/10.22373/ljee.v6i2.10719.