“INVESTMENT ANALYSIS OF A 5 MW GEOTHERMAL BINARY CYCLE POWER PLANT” (2024) Indonesian Journal of Environmental Sustainability, 1(2), pp. 146–154. doi:10.22373/ijes.v1i2.4246.