Nur, S., & Mulyadi Abdul Wahid. (2024). INVESTMENT ANALYSIS OF A 5 MW GEOTHERMAL BINARY CYCLE POWER PLANT. Indonesian Journal of Environmental Sustainability, 1(2), 146–154. https://doi.org/10.22373/ijes.v1i2.4246