[1]
Nur, S. and Mulyadi Abdul Wahid 2024. INVESTMENT ANALYSIS OF A 5 MW GEOTHERMAL BINARY CYCLE POWER PLANT. Indonesian Journal of Environmental Sustainability. 1, 2 (Jan. 2024), 146–154. DOI:https://doi.org/10.22373/ijes.v1i2.4246.